LANG GROUND FLOOR

Location:
EUGENE LANG 65 WEST 11TH STREET - BUILDING B
1st floor.

Scope of Work:
The renovation of the ground floor at 65 W. 11th Street was completed in March, 2018. The existing cafeteria on the south side of the floor was converted to a café and lounge. The dropped ceiling was removed and all new lighting installed to make a vibrant space for the TNS community. The north side of the floor where two seminar rooms were once housed was turned into the new Millimeter Reading Room with soft seating for reading and tables for quiet study.

Timeline:
Project completion: Summer 2018.