HVAC Equipment Replacement

Location:
JOHNSON/KAPLAN HALL - 66 W 12TH - BUILDING A
Roof.

Scope of Work:
This project includes the removal of the two HVAC units from a difficult position, situated on a steel structure in the elevator machine room. The new unit is air cooled and will improve the ventilation from the 3rd floor to the 9th.
A 2-hour partition wall will be constructed between the elevator machine room and the mechanical room.

Timeline:
Scheduled completion: March 2017.